Disability Access Consultants

 

Creative Solutions to Increase Access

A ferry gangway has to work at the tide you actually have

Hook

A gangway can look accessible at the wharf and be unsafe an hour later.

What the draft proposes

Fixed and removable gangways receive explicit controls for gradient, security, handrails, barriers, surface, load testing and practical trials.

Why it matters

Reliable ferry access depends on tides, vessel freeboard, weather and crew practice.

What providers can do now

Model and test every landing across ordinary operating ranges, not a single inspection point.

Discussion prompt

Do you have evidence that your gangways work in wet, low-tide and peak conditions?

CTA

Book a wharf-to-vessel access assessment.

Source note

Based on Schedules 6 and 8 of the 2025 exposure draft. It is not final law.